BB-LA6 Battery

BB-LA6 Battery

A sealed 12-volt BB-LA6 lead-acid battery in a durable high-impact plastic case.

Select options

Product overview

BB-LA6 Battery overview

A sealed 12-volt BB-LA6 lead-acid battery in a durable high-impact plastic case. This page consolidates the principal information from the official Golden Season datasheet so emergency planners, trainers, logistics personnel, and procurement specialists can assess the documented configuration before requesting a quotation.

The lead acid battery should be evaluated against the operating environment, storage location, transport method, user training, inspection procedures, and applicable organisational policies. Confirm pack configuration and supplied components before ordering.

lead acid battery features

  • Impact, drop, vibration, voltage, and mechanical-shock testing listed
  • Internal auto-reset fuse
  • Nickel, silver, and gold-plated contacts
  • Modified Mil-Spec ABS case
  • Multiple case colours listed

These characteristics are grounded in the supplied product literature. They describe the documented product and do not imply endorsement by any organisation referenced in the source.

Specifications

Planning and product support

Before use, inspect the item and packaging, confirm that expected components are present, and follow current manufacturer instructions. Medical and training equipment should be used by appropriately trained people within applicable protocols. Battery products and chargers should be operated, stored, maintained, and disposed of in accordance with their instructions and local requirements.

Explore the related Golden Season product range for other verified products. You can also view the official product factsheet used as the source for this page. Contact Golden Season for current availability, specifications, and project-specific guidance.

Retain the latest product information with procurement, inventory, and training records. This helps responsible teams verify the supplied model, identify damaged or incomplete equipment, and plan replacement, maintenance, or replenishment before deployment.

[dflip id="899"][/dflip]
[dflip id="924"][/dflip]

MEDEVAC4

See our MedEvac4 Setup Guide or Technical Information Sheet